Enter slab length, width and thickness. You get an order quantity that already includes a waste allowance (default 10%), bag counts for 40 / 60 / 80 lb mix, and a side-by-side material cost for bags versus a truck — so you can decide how to buy before you dig. Defaults match a common 10×10 patio at 4 inches; change any field and the answer updates as you type.
How the concrete calculation works
- Measure the slab length and width in feet.
- Decide the thickness — 4 in for patios and walkways, 5–6 in for driveways that take vehicles.
- Leave Waste allowance at 10% unless the pad is carefully level (5%) or the dig is rough (15%).
- Convert thickness from inches to feet by dividing by 12, then multiply length × width × thickness for net cubic feet.
- Apply the waste percent, divide by 27, and round ready-mix up to the next 1/4 yard — that headline is the number you give the supplier.
- For bags, divide the with-waste cubic feet by the bag yield: 0.60 for 80 lb, 0.45 for 60 lb, 0.30 for 40 lb, then round up.
The formula
Net volume (ft³) = Length (ft) × Width (ft) × Thickness (in) ÷ 12. Multiply by (1 + waste/100), divide by 27 for cubic yards, then round ready-mix up to the next 1/4 yard.
Quick answer for a typical patio slab
The defaults above are a 10 ft × 10 ft slab at 4 inches with a 10% waste allowance. Net volume is 1.23 cubic yards; with waste that is 1.36 yd³, so you order 1.50 cubic yards of ready-mix (rounded up to the next 1/4 yard). In bags that is 62 bags of 80 lb mix (or 82 of 60 lb, or 123 of 40 lb). Material cost lands around $372 in bags or $345 as ready-mix. Change length, width, thickness or waste and the calculator re-runs instantly.
Four inches is the usual thickness for a patio, walkway or shed pad. Bump it to 5 or 6 inches if a car will park on it. The Waste allowance field defaults to 10 percent because sub-grade is never perfectly level, and running short mid-pour leaves a cold joint that never fully bonds.
How to use this concrete calculator
- Measure the slab length and width in feet. Split L-shaped pads into rectangles and add the volumes.
- Pick a thickness: 4 in for foot traffic, 5–6 in for vehicles or soft soil.
- Leave Waste allowance at 10% unless the pad is carefully level (try 5%) or the dig is rough (15%).
- Optional: enter what you actually pay for an 80 lb bag so the bag cost column matches your store.
- Read the headline first — that is the ready-mix order quantity (with waste, rounded to 1/4 yard). Then check the bag rows if you are mixing yourself.
Bags vs ready-mix (bulk truck)
Concrete is sold two ways, and the cheaper option flips as the slab grows. Bags are convenient for fence posts and small pads, but you pay for packaging and for your own mixing time. A truck wins on price per cubic yard once you are past roughly one yard, and it arrives all at once — which is what you want on pour day.
- Under about 1 yd³ — bags usually win. A short-load fee on a tiny truck order can cost more than the concrete itself.
- 1 to 3 yd³ — the awkward middle. Compare a delivered quote (including the short-load surcharge) against bag cost plus a rented drum mixer and a day's labour.
- Over about 3 yd³ — order ready-mix. Bag counts climb into the hundreds and you cannot mix and place them before the first batch stiffens.
The table below is 4 inch slabs at typical US prices, including the default 10% waste: $6 for an 80 lb bag, $170 per cubic yard delivered, plus a $90 short-load fee under 5 cubic yards. The Order column is the ready-mix quantity after rounding up to the next 1/4 yard.
| Slab | Order | 80 lb bags | Bag cost | Ready-mix | Installed |
|---|---|---|---|---|---|
| 10×10 ft | 1.50 yd³ | 62 | $372 | $345 | $600–$1,200 |
| 12×12 ft | 2 yd³ | 88 | $528 | $430 | $864–$1,728 |
| 16×16 ft | 3.50 yd³ | 157 | $942 | $685 | $1,536–$3,072 |
| 20×20 ft | 5.50 yd³ | 245 | $1,470 | $935 | $2,400–$4,800 |
| 24×24 ft | 8 yd³ | 352 | $2,112 | $1,360 | $3,456–$6,912 |
| 30×30 ft | 12.25 yd³ | 550 | $3,300 | $2,083 | $5,400–$10,800 |
Installed range is a rule of thumb for base, reinforcement, labour and finishing at $6–$12 per ft². It is not part of the calculator above.
Common mistakes that waste concrete (or ruin a pour)
- Forgetting to convert inches to feet. Thickness goes in as inches; the formula divides by 12. Entering 4 as feet instead of inches multiplies the order by twelve.
- Ordering the net volume with waste set to zero. Real ground has low spots. Keep the Waste allowance at 5 to 10 percent, especially on DIY digs — the headline already applies it for you.
- Mixing with too much water. A soupy mix is easier to place and much weaker. Follow the bag, and keep batches consistent so one wet patch does not dust later.
- Skipping the compacted base. Four inches of compacted crushed stone under the slab stops settlement cracks more effectively than any additive in the mix.
- Letting mesh sit on the dirt. Reinforcement only works at mid-depth. Use chairs; bars or mesh on the sub-base do almost nothing.
- Starting without a placement plan. On anything over a couple of yards, decide truck access, chute reach and who screeds before the mixer arrives. You cannot pause a truck load to fetch tools.
What the material price leaves out
Base gravel, form lumber, mesh or rebar, a plate compactor rental, permits and spoil disposal all sit outside the concrete price. On a small patio those extras can add as much again as the concrete itself, which is why the installed column is so much wider than the bag and truck columns.
How to turn this into a real quote
Call two ready-mix suppliers with the order cubic yards from the calculator and ask three questions: price per yard, short-load fee, and whether delivery and a pump are included. Buying bags instead? Price the same brand at two stores — the spread is often a dollar a bag, which is real money at 62 bags.
Prices are US averages for budgeting, not quotes. Regional rates, seasonal demand and fuel surcharges can move them by 30% or more.
If the same pad will be tiled later, use the tile calculator to turn the floor area into boxes, waste and thinset. Both tools use the same kind of fixed formula; how the numbers are made is written up on the About page.
Common questions
How many 80 lb bags of concrete are in a cubic yard?
About 45. One 80 lb bag yields roughly 0.60 ft³ and a cubic yard is 27 ft³, so 27 ÷ 0.60 = 45 bags. For a 60 lb bag it is about 60 bags, and about 90 bags for 40 lb.
How thick should a concrete slab be?
Four inches is standard for patios, walkways and shed floors. Use 5 inches for driveways carrying cars and 6 inches for heavy vehicles, RVs or where the slab sits on weak soil.
How much does a yard of concrete weigh?
Roughly 4,000 lb, or about 2 tons. That is 145 lb per cubic foot. This matters if you are mixing by hand rather than ordering a truck.
Should I add extra for waste and spillage?
Yes. This calculator includes a Waste allowance field (default 10 percent), so the order quantity already covers typical spillage and low spots. Sub-grade is never perfectly level and some concrete is always lost. Running out halfway through a pour leaves a cold joint that never fully bonds. Drop the field to 5 percent on a carefully dug, level pad, or raise it toward 15 percent on rough DIY digs.
Is bagged concrete cheaper than ready-mix?
For anything over about 1 cubic yard, ready-mix is usually cheaper and far less work. Bagged concrete makes sense for fence posts, small pads and repairs where a truck cannot reach.
How much does a 10×10 concrete slab cost?
A 10×10 slab at 4 inches is 1.23 cubic yards net. With the default 10% waste allowance that is 1.36 yd³ before rounding, so you order 1.50 yd³ of ready-mix. In 80 lb bags that is 62 bags, about $372 at $6 a bag. Delivered ready-mix runs about $345, including the short-load fee on a small order. Add base, reinforcement and labour and installed flatwork usually lands between $600 and $1,200.
How much does concrete cost per square foot?
Material alone is roughly $2 to $4 per square foot for a 4 inch slab bought in bags, or about $2 as ready-mix before delivery and short-load fees. Installed — base, reinforcement, labour and finishing — most flatwork falls between $6 and $12 per square foot. Thickness and truck access move that range more than anything else.
Sizes people search for
Jump straight to a worked example:
- How Much Concrete for a 10×10 Slab at 4 Inches?
- How Much Concrete for a 10×10 Slab at 6 Inches?
- How Much Concrete for a 12×12 Slab at 4 Inches?
- How Much Concrete for a 12×12 Slab at 6 Inches?
- How Much Concrete for a 10×12 Slab at 4 Inches?
- How Much Concrete for a 10×12 Slab at 6 Inches?
- How Much Concrete for a 12×16 Slab at 4 Inches?
- How Much Concrete for a 12×16 Slab at 6 Inches?
- How Much Concrete for a 16×16 Slab at 4 Inches?
- How Much Concrete for a 16×16 Slab at 6 Inches?
- How Much Concrete for a 20×20 Slab at 4 Inches?
- How Much Concrete for a 20×20 Slab at 6 Inches?
- How Much Concrete for a 10×20 Slab at 4 Inches?
- How Much Concrete for a 10×20 Slab at 6 Inches?
- How Much Concrete for a 12×24 Slab at 4 Inches?
- How Much Concrete for a 12×24 Slab at 6 Inches?
- How Much Concrete for a 20×24 Slab at 4 Inches?
- How Much Concrete for a 20×24 Slab at 6 Inches?
- How Much Concrete for a 24×24 Slab at 4 Inches?
- How Much Concrete for a 24×24 Slab at 6 Inches?
- How Much Concrete for a 30×30 Slab at 4 Inches?
- How Much Concrete for a 30×30 Slab at 6 Inches?
- How Much Concrete for a 10×30 Slab at 4 Inches?
- How Much Concrete for a 10×30 Slab at 6 Inches?