How Much Concrete for a 30×30 Slab at 4 Inches?
A 30 ft × 30 ft slab 4 inches thick needs this much concrete — cubic yards and bag counts, calculated for you. Here is the answer, plus a calculator you can adjust if your measurements are slightly different.
Answer: 11.11 cubic yards
How it changes with thickness
Same area, different thickness:
| Thickness | 4 | 5 | 6 |
|---|---|---|---|
| Concrete needed | 11.11 cubic yards | 13.89 cubic yards | 16.67 cubic yards |
| 80 lb bags | 500 bags | 625 bags | 750 bags |
What a 30×30 slab at 4 inches actually involves
At 11.11 yd³ this is a serious pour that deserves a plan. You want a crew of at least six, a definite answer on where the trucks park, and a pump if access is tight or reach exceeds the chute. Splitting a slab this size into two pours leaves a cold joint at the seam, so place it in one continuous run if you possibly can.
The slab is 900 ft² and, at 4 inches thick, takes 300.00 ft³ of concrete — 11.11 yd³, weighing about 22.2 tons. Everything below is worked out from those figures.
Full material list
| Item | Quantity | Notes |
|---|---|---|
| Concrete | 11.11 yd³ | 500 × 80 lb bags, or 667 × 60 lb bags |
| Gravel base | 13.33 yd³ | order loose for 4 in compacted; see the gravel calculator |
| Form lumber | 132 lin ft | 2×4 or 2×6, includes 10% waste |
| Form stakes | 30 | roughly one every 4 ft of perimeter |
| Welded wire mesh | 20 sheets | 5×10 ft sheets of 6×6-W1.4 mesh, 10% overlap |
| Vapor barrier | 990 ft² | about 100 lin ft of 10 ft wide roll |
| Control joints | 6 joints | 180 lin ft of saw cut |
Control joints and cracking
Control joints stop a slab cracking wherever it likes. The conservative rule is to space them at twice the slab thickness in inches — here that means every 8 ft, which divides this slab into 4 × 4 panels of roughly 7.5 × 7.5 ft. That is 6 joints, about 180 linear ft of cutting. Get them in while the concrete is still green, typically 6 to 12 hours after finishing, before random cracks get there first.
Reinforcement at 4 inches
At 4 in, 20 sheets of 6×6-W1.4 welded wire mesh on chairs is the standard reinforcement. Lap the sheets about 6 in and keep them at mid-depth, so the steel ends up in the middle of the slab rather than resting on the sub-base. Mesh does not stop cracks forming — it holds them tight after they do, which is exactly what you want in a patio or shed floor. If this slab will take vehicles, step up to 5 or 6 in and use rebar instead.
Bagged concrete or a ready-mix truck?
| Option | Quantity | Estimated cost |
|---|---|---|
| Bagged 80 lb | 500 bags | $3,000 |
| Ready-mix delivered | 11.11 yd³ | $1,889 |
On these assumptions ready-mix is cheaper ($1,889 vs $3,000) as well as far less work. It only wins if the truck can actually reach the site and you can place the whole load without stopping. If access is a problem, bagged at $3,000 is the practical fallback and lets you pour in stages.
Costs assume $6 per 80 lb bag, $170 per cubic yard delivered, and a $90 short-load surcharge below 5 yd³. Ready-mix pricing moves with region, season and fuel, so treat these as a starting point for calling suppliers rather than a quote.
Pour day, in order
- Excavate to 8 in below finished grade: 4 in of slab plus 4 in of base.
- Compact the base in two lifts and proof-roll it with a loaded wheelbarrow to find soft spots before you cover them.
- Set and generously stake the forms. On a pour this size the forms take real pressure, so brace every run and back up outside corners.
- Lay the vapor barrier and reinforce on chairs. Have a pump or a second chute plan if reach exceeds 18 ft.
- Book the trucks as a staggered sequence so one arrives as the last is finishing. Gaps create cold joints you cannot undo.
- Brief the crew on roles: two on the chute, two raking, one screeding, one floating. Nobody improvises on the day.
- Place continuously and keep a wet edge throughout. If you must stop, stop at a planned joint, never mid-panel.
- Cut or tool the control joints while the concrete is still green, aiming for 6 to 12 hours after finishing. You need about 180 linear ft of cutting.
- Cover and keep damp for 7 days, and keep vehicles off it for 28.
Local codes cover frost depth, reinforcement and permits, and they vary from place to place. Check with your local building department before you dig or pour.
Common questions
How many bags of concrete for a 30×30 slab at 4 inches?
500 bags of 80 lb mix, or 667 bags of 60 lb mix. A 30×30 slab at 4 in is 300.00 ft³, which is 11.11 yd³. An 80 lb bag yields about 0.60 ft³ and a 60 lb bag about 0.45 ft³, so divide the volume by the yield and round up.
How much does a 30×30 concrete slab cost?
Roughly $3,000 in 80 lb bags, or about $1,889 delivered as ready-mix. Material only — it excludes excavation, base, reinforcement and labour.
How thick should a 30×30 slab be?
Four inches for a patio, shed floor or footpath. Five to six inches if vehicles will drive on it. This page is worked through at 4 inches, so switch the calculator above to compare thicknesses.
How much gravel goes under a 30×30 slab?
About 13.33 yd³ of loose crushed base for a 4 in compacted layer, covering 900 ft². Order it loose rather than already compacted — the material settles by roughly a fifth under a plate compactor.
Other sizes
- How Much Concrete for a 10×10 Slab at 4 Inches?
- How Much Concrete for a 10×10 Slab at 6 Inches?
- How Much Concrete for a 12×12 Slab at 4 Inches?
- How Much Concrete for a 12×12 Slab at 6 Inches?
- How Much Concrete for a 10×12 Slab at 4 Inches?
- How Much Concrete for a 10×12 Slab at 6 Inches?
- How Much Concrete for a 12×16 Slab at 4 Inches?
- How Much Concrete for a 12×16 Slab at 6 Inches?
- How Much Concrete for a 16×16 Slab at 4 Inches?
- How Much Concrete for a 16×16 Slab at 6 Inches?