How Much Concrete for a 20×20 Slab at 6 Inches?

A 20 ft × 20 ft slab, 6 inches thick, needs 7.41 yd³ net — with a 10% waste allowance that is 8.15 yd³, so you order 8.25 yd³ of ready-mix. That is about 367 bags of 80 lb mix, 489 of 60 lb, or 734 of 40 lb. It weighs roughly 32,593 lb (16.3 tons) and costs about $2,202 in bags or $1,403 delivered as ready-mix. Change anything below and the figures follow.

Answer: 8.25 cubic yards

How many bags of concrete for a 20×20 slab?

Bag sizeBags neededYieldsWeight to handle
80 lb367 bags0.60 ft³ each29,360 lb
60 lb489 bags0.45 ft³ each29,340 lb
40 lb734 bags0.30 ft³ each29,360 lb

All three rows buy the same 8.15 yd³ with 10% waste included (net was 7.41 yd³). Smaller bags mean more of them to open, but they are easier to lift and easier to mix in small batches.

Read that bag count as a warning rather than a plan. 367 bags is roughly 16.3 tons to carry, open and mix, and the mixing would not finish anywhere near a placement window — a load this size stiffens while you are still working through the pallet. Order ready-mix. The bag figure is here so you can see why: a truck brings the whole 8.25 yd³ in one delivery for about $1,403.

If your slab is a different size

Same 6 inch thickness, same 10% waste allowance, different footprint:

SizeOrder at 6 in
16×165.25 yd³ · 235 bags
12×246.00 yd³ · 264 bags
10×306.25 yd³ · 275 bags
20×2410.00 yd³ · 440 bags
24×2411.75 yd³ · 528 bags

How it changes with thickness

Same area, different thickness:

Thickness456
Order this much5.50 cubic yards7 cubic yards8.25 cubic yards
With 10% waste5.43 yd³6.79 yd³8.15 yd³

What a 20×20 slab at 6 inches actually involves

At 8.15 yd³ this is a serious pour that deserves a plan. You want a crew of at least six, a definite answer on where the trucks park, and a pump if access is tight or reach exceeds the chute. Splitting a slab this size into two pours leaves a cold joint at the seam, so place it in one continuous run if you possibly can.

The slab is 400 ft² and, at 6 inches thick, needs 200.00 ft³ net (7.41 yd³). With a 10% waste allowance that is 220.00 ft³ (8.15 yd³), so you order 8.25 yd³ of ready-mix after the usual 1/4-yard round-up. That load weighs about 16.3 tons. Everything below is worked out from those figures.

Full material list

ItemQuantityNotes
Concrete (order)8.25 yd³10% waste included; 367 × 80 lb bags, or 489 × 60 lb bags
Gravel base5.93 yd³order loose for 4 in compacted; see the gravel calculator
Form lumber88 lin ft2×4 or 2×6, includes 10% waste
Form stakes20roughly one every 4 ft of perimeter
Welded wire mesh9 sheets5×10 ft sheets of 6×6-W1.4 mesh, 10% overlap
Rebar600 lin ft#4 (1/2 in) on an 18 in grid, tied and on chairs
Vapor barrier440 ft²about 45 lin ft of 10 ft wide roll
Control joints2 joints40 lin ft of saw cut

Control joints and cracking

Control joints stop a slab cracking wherever it likes. The conservative rule is to space them at twice the slab thickness in inches — here that means every 12 ft, which divides this slab into 2 × 2 panels of roughly 10.0 × 10.0 ft. That is 2 joints, about 40 linear ft of cutting. Get them in while the concrete is still green, typically 6 to 12 hours after finishing, before random cracks get there first.

Reinforcement at 6 inches

At 6 in, welded wire mesh is no longer adequate — this slab is thick enough to carry loads, and mesh just stretches once a crack opens. The usual reinforcement is #4 (1/2 in) rebar on an 18 in grid: about 15 bars running the 20 ft direction and 15 running the 20 ft direction, roughly 600 linear ft of steel. Tie every intersection and set the grid on chairs so the bars finish at mid-depth with 2 to 3 in of cover. Bars lying on the ground do almost nothing.

Bagged concrete or a ready-mix truck?

OptionQuantityEstimated cost
Bagged 80 lb367 bags$2,202
Ready-mix delivered8.25 yd³$1,403

On these assumptions ready-mix is cheaper ($1,403 vs $2,202) as well as far less work. It only wins if the truck can actually reach the site and you can place the whole load without stopping. If access is a problem, bagged at $2,202 is the practical fallback and lets you pour in stages.

Costs assume $6 per 80 lb bag, $170 per cubic yard delivered, and a $90 short-load surcharge below 5 yd³. Ready-mix pricing moves with region, season and fuel, so treat these as a starting point for calling suppliers rather than a quote.

Pour day, in order

  1. Excavate to 10 in below finished grade: 6 in of slab plus 4 in of base.
  2. Compact the base in two lifts and proof-roll it with a loaded wheelbarrow to find soft spots before you cover them.
  3. Set and generously stake the forms. On a pour this size the forms take real pressure, so brace every run and back up outside corners.
  4. Lay the vapor barrier and reinforce on chairs. Have a pump or a second chute plan if reach exceeds 18 ft.
  5. Book the trucks as a staggered sequence so one arrives as the last is finishing. Gaps create cold joints you cannot undo.
  6. Brief the crew on roles: two on the chute, two raking, one screeding, one floating. Nobody improvises on the day.
  7. Place continuously and keep a wet edge throughout. If you must stop, stop at a planned joint, never mid-panel.
  8. Cut or tool the control joints while the concrete is still green, aiming for 6 to 12 hours after finishing. You need about 40 linear ft of cutting.
  9. Cover and keep damp for 7 days, and keep vehicles off it for 28.

Local codes cover frost depth, reinforcement and permits, and they vary from place to place. Check with your local building department before you dig or pour.

Common questions

How many bags of concrete do I need for a 20×20 slab?

367 bags of 80 lb mix, 489 of 60 lb, or 734 of 40 lb, all at 6 inches thick with a 10% waste allowance. Net volume is 200.00 ft³ (7.41 yd³); with waste that is 220.00 ft³ (8.15 yd³), so you order 8.25 yd³ of ready-mix. Divide the with-waste volume by the yield on the bag — 0.60 ft³ for an 80 lb bag — then round up.

How much does a 20×20 slab weigh?

About 32,593 lb, or 16.3 tons including the 10% waste allowance. Concrete runs roughly 4,000 lb per cubic yard and the with-waste volume is 8.15 yd³. That weight matters twice: on the sub-base you are pouring onto, and on whatever vehicle fetches the material.

How much does a 20×20 concrete slab cost?

Roughly $2,202 in 80 lb bags, or about $1,403 delivered as ready-mix (both include 10% waste). Material only — excavation, base, reinforcement and labour are extra. Ring two suppliers; delivered prices move a lot by region.

Can I mix a 20×20 slab myself?

Not realistically. 367 bags would have to be mixed and placed faster than a small crew can manage, and a part-set batch cannot be rescued. This is a ready-mix job — about $1,403 delivered for 8.25 yd³.

How thick should a 20×20 slab be?

Four inches for a patio, shed base or footpath; five to six inches where a car parks. This page is calculated at 6 inches, and the calculator above re-runs instantly if you switch it — doubling the thickness roughly doubles both the concrete and the cost.

Do I need rebar or mesh in a 20×20 slab?

At 6 inches, welded wire mesh is no longer the right choice — use #3 or #4 rebar on a 24 inch grid, tied and set on chairs at mid-depth. Bars lying on the sub-base do almost nothing.