Home › Concrete Calculator › This size
How Much Concrete for a 24×24 Slab at 4 Inches?
A 24 ft × 24 ft slab, 4 inches thick, needs 7.11 yd³ net — with a 10% waste allowance that is 7.82 yd³, so you order 8.00 yd³ of ready-mix. That is about 352 bags of 80 lb mix, 470 of 60 lb, or 704 of 40 lb. It weighs roughly 31,289 lb (15.6 tons) and costs about $2,112 in bags or $1,360 delivered as ready-mix. Change anything below and the figures follow.
Answer: 8 cubic yards
How many bags of concrete for a 24×24 slab?
| Bag size | Bags needed | Yields | Weight to handle |
|---|---|---|---|
| 80 lb | 352 bags | 0.60 ft³ each | 28,160 lb |
| 60 lb | 470 bags | 0.45 ft³ each | 28,200 lb |
| 40 lb | 704 bags | 0.30 ft³ each | 28,160 lb |
All three rows buy the same 7.82 yd³ with 10% waste included (net was 7.11 yd³). Smaller bags mean more of them to open, but they are easier to lift and easier to mix in small batches.
Read that bag count as a warning rather than a plan. 352 bags is roughly 15.6 tons to carry, open and mix, and the mixing would not finish anywhere near a placement window — a load this size stiffens while you are still working through the pallet. Order ready-mix. The bag figure is here so you can see why: a truck brings the whole 8.00 yd³ in one delivery for about $1,360.
If your slab is a different size
Same 4 inch thickness, same 10% waste allowance, different footprint:
| Size | Order at 4 in |
|---|---|
| 16×16 | 3.50 yd³ · 157 bags |
| 12×24 | 4.00 yd³ · 176 bags |
| 10×30 | 4.25 yd³ · 184 bags |
| 20×20 | 5.50 yd³ · 245 bags |
| 20×24 | 6.75 yd³ · 294 bags |
How it changes with thickness
Same area, different thickness:
| Thickness | 4 | 5 | 6 |
|---|---|---|---|
| Order this much | 8 cubic yards | 10 cubic yards | 11.75 cubic yards |
| With 10% waste | 7.82 yd³ | 9.78 yd³ | 11.73 yd³ |
What a 24×24 slab at 4 inches actually involves
This is a truck pour. At 7.82 yd³ there is no realistic way to mix and place it by hand before the first batch starts to stiffen, so order ready-mix. Before you order, walk the route: a standard truck chute reaches roughly 16 to 18 ft from the truck, so the far corner needs to be inside that, or you will be running wheelbarrows from a heap.
The slab is 576 ft² and, at 4 inches thick, needs 192.00 ft³ net (7.11 yd³). With a 10% waste allowance that is 211.20 ft³ (7.82 yd³), so you order 8.00 yd³ of ready-mix after the usual 1/4-yard round-up. That load weighs about 15.6 tons. Everything below is worked out from those figures.
Full material list
| Item | Quantity | Notes |
|---|---|---|
| Concrete (order) | 8.00 yd³ | 10% waste included; 352 × 80 lb bags, or 470 × 60 lb bags |
| Gravel base | 8.53 yd³ | order loose for 4 in compacted; see the gravel calculator |
| Form lumber | 106 lin ft | 2×4 or 2×6, includes 10% waste |
| Form stakes | 24 | roughly one every 4 ft of perimeter |
| Welded wire mesh | 13 sheets | 5×10 ft sheets of 6×6-W1.4 mesh, 10% overlap |
| Vapor barrier | 634 ft² | about 64 lin ft of 10 ft wide roll |
| Control joints | 4 joints | 96 lin ft of saw cut |
Control joints and cracking
Control joints stop a slab cracking wherever it likes. The conservative rule is to space them at twice the slab thickness in inches — here that means every 8 ft, which divides this slab into 3 × 3 panels of roughly 8.0 × 8.0 ft. That is 4 joints, about 96 linear ft of cutting. Get them in while the concrete is still green, typically 6 to 12 hours after finishing, before random cracks get there first.
Reinforcement at 4 inches
At 4 in, 13 sheets of 6×6-W1.4 welded wire mesh on chairs is the standard reinforcement. Lap the sheets about 6 in and keep them at mid-depth, so the steel ends up in the middle of the slab rather than resting on the sub-base. Mesh does not stop cracks forming — it holds them tight after they do, which is exactly what you want in a patio or shed floor. If this slab will take vehicles, step up to 5 or 6 in and use rebar instead.
Bagged concrete or a ready-mix truck?
| Option | Quantity | Estimated cost |
|---|---|---|
| Bagged 80 lb | 352 bags | $2,112 |
| Ready-mix delivered | 8.00 yd³ | $1,360 |
On these assumptions ready-mix is cheaper ($1,360 vs $2,112) as well as far less work. It only wins if the truck can actually reach the site and you can place the whole load without stopping. If access is a problem, bagged at $2,112 is the practical fallback and lets you pour in stages.
Costs assume $6 per 80 lb bag, $170 per cubic yard delivered, and a $90 short-load surcharge below 5 yd³. Ready-mix pricing moves with region, season and fuel, so treat these as a starting point for calling suppliers rather than a quote.
Pour day, in order
- Excavate to 8 in below finished grade: 4 in of slab plus 4 in of base.
- Compact the base in two lifts with a plate compactor, then damp it down so it does not pull water out of the mix.
- Set the forms to 4 in and check the level carefully. A truck load forgives nothing, and you cannot stop to fix it.
- Lay the vapor barrier, then the mesh on chairs at mid-depth.
- Confirm truck access and chute reach before you order. A standard chute covers roughly 16 to 18 ft, so walk the route and measure.
- Line up four or more people. Have boots, rakes, a screed board, a bull float and a hose waiting before the truck arrives.
- Place from the far corner back toward the truck, working continuously. Screed directly behind the placement, not after.
- Cut or tool the control joints while the concrete is still green, aiming for 6 to 12 hours after finishing. You need about 96 linear ft of cutting.
- Cover it and keep it damp for 7 days. Full design strength arrives at 28 days.
Local codes cover frost depth, reinforcement and permits, and they vary from place to place. Check with your local building department before you dig or pour.
Common questions
How many bags of concrete do I need for a 24×24 slab?
352 bags of 80 lb mix, 470 of 60 lb, or 704 of 40 lb, all at 4 inches thick with a 10% waste allowance. Net volume is 192.00 ft³ (7.11 yd³); with waste that is 211.20 ft³ (7.82 yd³), so you order 8.00 yd³ of ready-mix. Divide the with-waste volume by the yield on the bag — 0.60 ft³ for an 80 lb bag — then round up.
How much does a 24×24 slab weigh?
About 31,289 lb, or 15.6 tons including the 10% waste allowance. Concrete runs roughly 4,000 lb per cubic yard and the with-waste volume is 7.82 yd³. That weight matters twice: on the sub-base you are pouring onto, and on whatever vehicle fetches the material.
How much does a 24×24 concrete slab cost?
Roughly $2,112 in 80 lb bags, or about $1,360 delivered as ready-mix (both include 10% waste). Material only — excavation, base, reinforcement and labour are extra. Ring two suppliers; delivered prices move a lot by region.
Can I mix a 24×24 slab myself?
Not realistically. 352 bags would have to be mixed and placed faster than a small crew can manage, and a part-set batch cannot be rescued. This is a ready-mix job — about $1,360 delivered for 8.00 yd³.
How thick should a 24×24 slab be?
Four inches for a patio, shed base or footpath; five to six inches where a car parks. This page is calculated at 4 inches, and the calculator above re-runs instantly if you switch it — doubling the thickness roughly doubles both the concrete and the cost.
Do I need rebar or mesh in a 24×24 slab?
At 4 inches, 6×6-W1.4 welded wire mesh on chairs is standard. Mesh will not stop a crack forming, but it holds the two sides together when one does, which is what you want in a patio. Step up to rebar if vehicles will drive on it.
Other sizes
- How Much Concrete for a 10×10 Slab at 4 Inches?
- How Much Concrete for a 10×10 Slab at 6 Inches?
- How Much Concrete for a 12×12 Slab at 4 Inches?
- How Much Concrete for a 12×12 Slab at 6 Inches?
- How Much Concrete for a 10×12 Slab at 4 Inches?
- How Much Concrete for a 10×12 Slab at 6 Inches?
- How Much Concrete for a 12×16 Slab at 4 Inches?
- How Much Concrete for a 12×16 Slab at 6 Inches?
- How Much Concrete for a 16×16 Slab at 4 Inches?
- How Much Concrete for a 16×16 Slab at 6 Inches?